Phone Map
Book a Flight

Book a Flight

A Better Way to Go
One-Way
Round Trip
Please choose:
Akron Canton Airport Cak Toddler In Play Area

Taxi From Akron-Canton Airport

A & E Taxi LLC

330-324-6844

Accepts: Cash and Major Credit Cards

Meter Drop: $20
+$2.00 per mile ($0.20 per 1/10 mile)

Additional Miles over 150 (Cost per Mile): $2.00
Additional People (over 4): Half of metered fare (ie: $30 fare will be $45)
Additional Stops Cost: Refer to wait time
Waiting Time Fee: $0.40 per minute, $24 per hour
Discounts to Meter Rates: N/A

ratesheet.pdf

A 330 Taxi, LLC

visit website 330-999-9100

Accepts: Cash and Major Credit Cards
Meter Drop:
$20+$2.50 per mile

Additional Fees
Additional Stops Cost: Based on wait time at $0.50 per minute.
Waiting Time Fee: $0.50 per minute.
Discounts to Meter Rates: Long distance, prepaid prearranged rides.

Airport Taxi

330-434-4444

Accepts: Cash and Major Credit Cards
Meter Drop: $20
+$2.00 per mile ($0.20 per 1/10 mile)

Additional Fees
Additional People (over 4): Half of metered fare (i.e.: $30 fare will be $45)
Additional Stops Cost: $2-$5
Waiting Time Fee: $0.40 per minute, $24 per hour
Discounts to Meter Rates: Sometimes available per driver discretion

Akron-Canton Taxi

visit website 330-808-2159

Accepts: Cash and Major Credit Cards
Meter Drop: $25
$2.80 per mile

Additional Fees
Additional Miles of 150 (cost per mile): $2 per mile
Waiting Time Fee: $1 per minute

FareAware

Sign up for our newsletter for airfare deals and CAK announcements.

Go

Tell us what you think!

What's your favorite seat?

Window

Aisle

In exit row

In first row

View past polls

CAK Social

facebook twitter instagram
Construction Update! Phase 1 of the project is moving right along, including the two-level concourse consisting of 41,600 square feet. ✈️ #cakairport #abetterwaytogo #akroncantonairport #akron #canton #northeastohio #ohio #construction #airport #airportlife #airportoperations #constructionlife #modernization #airportops #aviation #hometown #convenient #new #better #updates #excitedforthefuture #travel #travelers #traveling #aviationdaily #buildit #photooftheday #airportdesign #construction_site #cantwait

2 days ago via Instagram

Construction Update! Phase 1 of the project is moving right along, including the two-level concourse consisting of 41,600 square feet. ✈️ #cakairport #abetterwaytogo #akroncantonairport #akron #canton #northeastohio #ohio #construction #airport #airportlife #airportoperations #constructionlife #modernization #airportops #aviation #hometown #convenient #new #better #updates #excitedforthefuture #travel #travelers #traveling #aviationdaily #buildit #photooftheday #airportdesign #construction_site #cantwait

close

Your next adventure is out there.

Don’t miss it. Sign up now for airfare deals and CAK Connections.

Go
No, thanks. I don't like to save money on airfare.